Delivery - Infrastructure
Offices
Our Head Office is located in the CBD of Perth, Western Australia at:
Level 18, AMP Building
140 St Georges Tce
Perth, Western Australia 6000
Business unit in Bangkok, Thailand:
15th Floor, Tower II (West)
SCB Park Plaza
18 Ratchadapisek Rd, Chatuchak
Bangkok 10900
Thailand
Other Locations
City based projects outside of Perth requiring a semi-permanent presence are catered for using Serviced Offices. Plexal Group has used this service in the past with great success.
Within 48 hours our people will be located in a local office with full IT capabilities, project support personnel (on an as needed basis) and all the office equipment required in today’s work environment.
Site infrastructure requirements are assessed on a case by case basis.
Office Setup
Our Head Office currently has 800m
2 and the Thailand Office is expanding to 700m
2 and can cater for over 150 personnel.
Software
Process Engineering
VMGSim – Process Simulation
3D Piping Design
Bentley Plantspace – 3D CAD
Autoplant - 3D CAD
Bentley Navigator – 3D Viewing tool
Navisworks – 3D Viewing tool
CAESAR II – Pipe Stressing Software
Zeataline Pipe Data Pro – Piping Specification Utility
Instrument Engineering
InstruCalc v7 – Instrument Engineering tool
exSILentia – Functional Safety tool
IDO (Instrument Design Tool) – Database Instrument Design tool
Electrical Engineering
Power Tools for Windows – Electrical Power System Engineering tool
AGI32 – Lighting Design Utility
CAD
AutoCad – 2D CAD
Microstation – 2D CAD
Insurances
We carry insurances typically required by a range of clients:
- Workers' Compensation for Western Australia and Thailand. Plexal Group will obtain the relevant insurance for this type of cover as required
- Public Liability $20m
- Professional Indemnity $10m
- Broadform Liability (e.g. theft, fire)
- Motor Vehicle
Additional coverage can be sourced.
Contracting Strategies
Plexal Group can provide services and integrated packages via a number of contracting methods:
- Lump sum
- Reimbursable hourly rates
- Combination of lump sum and reimbursable rates. This can be an effective model where portions of the scope cannot be well defined
- Risk/reward model
- Secondment at reimbursable rates