Home  |  Contact Us  |  Sitemap  |  Login
Monday, 6 September 2010
Delivery - Infrastructure

Offices
Our Head Office is located in the CBD of Perth, Western Australia at:
Level 18, AMP Building
140 St Georges Tce
Perth, Western Australia 6000
Business unit in Bangkok, Thailand:
15th Floor, Tower II (West)
SCB Park Plaza
18 Ratchadapisek Rd, Chatuchak
Bangkok 10900
Thailand
Other Locations
City based projects outside of Perth requiring a semi-permanent presence are catered for using Serviced Offices. Plexal Group has used this service in the past with great success.

Within 48 hours our people will be located in a local office with full IT capabilities, project support personnel (on an as needed basis) and all the office equipment required in today’s work environment.

Site infrastructure requirements are assessed on a case by case basis.


Office Setup
Our Head Office currently has 800m2 and the Thailand Office is expanding to 700m2 and can cater for over 150 personnel.


Software

Process Engineering
VMGSim – Process Simulation

3D Piping Design
Bentley Plantspace – 3D CAD
Autoplant - 3D CAD
Bentley Navigator – 3D Viewing tool
Navisworks – 3D Viewing tool
CAESAR II – Pipe Stressing Software
Zeataline Pipe Data Pro – Piping Specification Utility

Instrument Engineering
InstruCalc v7 – Instrument Engineering tool
exSILentia – Functional Safety tool
IDO (Instrument Design Tool) – Database Instrument Design tool

Electrical Engineering
Power Tools for Windows – Electrical Power System Engineering tool
AGI32 – Lighting Design Utility

CAD
AutoCad – 2D CAD
Microstation – 2D CAD


Insurances
We carry insurances typically required by a range of clients:
  • Workers' Compensation for Western Australia and Thailand. Plexal Group will obtain the relevant insurance for this type of cover as required
  • Public Liability $20m
  • Professional Indemnity $10m
  • Broadform Liability (e.g. theft, fire)
  • Motor Vehicle
Additional coverage can be sourced.


Contracting Strategies
Plexal Group can provide services and integrated packages via a number of contracting methods:
  • Lump sum
  • Reimbursable hourly rates
  • Combination of lump sum and reimbursable rates. This can be an effective model where portions of the scope cannot be well defined
  • Risk/reward model
  • Secondment at reimbursable rates